Lay-on Gable

Company: 

A lay-on gable frame is typically connected from the top during truss placement, but after sheathing is installed, this connection is no longer visible for the building inspector to verify. This creates a need for an alternate connection that is visible from below. This guide describes a simple, cost-effective, toe nail connection between the lay-on gable frames and supporting truss system that is visible after sheathing is installed.